1341 - Automotive Technology Career Instructional Building

 

 

Project Delivery Method              Design-Bid-Build

Project Budget                           $5.4 million

Construction Duration                 2009 – 2010

 

 

Scope/Summary

 

The Miramar College Automotive Career Instructional Building will consist of approximately 6,500 SF of new building construction to add additional laboratory space, classroom space and storage.  In addition ADA upgrades and minor renovations will be performed on the existing Automotive Technology Instructional Building.

 

  • Architect: Zagrodnik and Thomas Architects, LLP
  • Construction Manager: Black IPO
  • Structural Engineer: Structural Design Consultant & Associates
  • Electrical Engineer: Tanner Engineering
  • Mechanical Engineer: Bender Dean Engineering
  • Propositions S & N Program Manager: Gafcon, Inc.
  • Campus Project Manager: Jim Bray, Gafcon, Inc.
  • Assistant Campus Project Manager: Tyler Campbell, Gafcon, Inc.

                                                                                                                                                      


 

 Related Resources

  Miramar Campus Master Plan
  Miramar Master Plan: All Phases
  San Diego Miramar College
  Fact Sheet - District Wide 'Hand Dryer Vs. Paper Towels'

 Gallery

There are currently no favorite links to display.

 News & Events

There are currently no favorite links to display.
Copyright © 2007 SDCCD. All Rights Reserved.