1325 - Cogeneration Facility

Project Delivery Method:      Design/Build

Project Budget:                     $5.1 Million

Construction Duration:          2004-2005

 

Scope/Summary

This project consisted of the construction of a cogeneration facility to enable the college to lower utility bills.

 

  • Designer/Builder: Chevron Energy Solutions