1231 - Infrastructure Fire / Utilities / etc. Project

Project Budget:                  $8.1M
Construction Duration:        2009 - 2012

Scope / Summary

This campus-wide fire and utilites project will be completed by the end of 2012.

As of 12/15/08, coordination completed with dry utility, water systems and drainage studies.

  • Architect: T.B.D.
  • Construction Manager: T.B.D.