1231 - Infrastructure Fire / Utilities / etc. Project
Project Budget: $8.1M Construction Duration: 2009 - 2012
Scope / Summary
This campus-wide fire and utilites project will be completed by the end of 2012.
As of 12/15/08, coordination completed with dry utility, water systems and drainage studies.
- Architect: T.B.D.
- Construction Manager: T.B.D.
|