1431 - West City Campus/Point Loma Campus
Project Delivery Method Design-bid-build
Project Budget $16 million
Construction Duration 2007 – 2009
Scope / Summary
This project consists of building a new 38,930 SF Type V two-story education building. The new building will house classrooms for Culinary Arts, Parenting, Sewing, Arts, Business Information Technology (BIT), English as a Second Language (ESL), and will have space for Distance Learning, Testing, a Career Center Library, and a Bookstore. There will also be a Multi-Purpose Room as well as Administrative Offices.
The project is being funded by Proposition S and will be conducted in two phases:
Phase I- Demolition of existing multipurpose building and other classroom buildings. Relocation of existing utilities, construction of the new building and site improvements south of the building.
Phase II- Demolition of remaining campus buildings and site items, construction of a new parking lot and landscaping improvements. The project is scheduled for completion in late March 2009.
- Architect: RJC Architects
- Construction Manager: Project Management Advisors, Inc.
- General Contractor: Soltek Pacific Construction Company
- Mechanical: MA Engineers
- Electrical: BSE Engineering
- LEED Consultants: Brummitt Energy Associates (BEA)
- Civil/Structural: Flores Lund Consultants (FLC)
- Surveying, etc.: RBF Consulting, Inc
|