1141 - "L" Building Renovation
Project Delivery Method Design-bid-build
Project Budget $10.3 million
Construction Duration 2008 - 2009
Scope/Summary
The Academic Success Center (L Building) renovation consists of the interior demolition of an existing two-story concrete building with complete structural upgrades, and interior renovation totaling approximately 28,700 sf. The renovation will include new space for Tutoring; the Math and English Centers; Trio Aspire; New Horizons; Umoja; Math, English & Science Achievement (MESA); Extended Opportunity Programs & Services (EOPS); Puente; Assessment and Advising, along with general classroom space.
The project involves replacement of all exterior windows and doors; replacement of elevator and interior stair; new interior non-load bearing partitions; modifications to structural concrete, new ceilings; new mechanical and electrical systems, distribution and fixtures; and all new architectural finishes. Nearly 5,000 sq. ft. of the existing concrete structure was preserved and sandblasted. Exterior work includes a new entry canopy structure, lighting and signage. All existing landscaping was preserved.
The project includes a number of special features:
· All exterior aluminum windows have thermal-setting powder coat finish applied to optimize temperature control efficiency
· Waterless urinals and electric hand-dryers were installed in restrooms to cut down on the waste of resources
· Enviro SLAB terrazzo was used for all countertops and backsplashes - this terrazzo is made from 100% post consumer/post industrial recycled glass and is designed to be cleaned with non-corrosive and biodegradable cleaners
· All paint used is low-fume and complies with VOC limits for volatile organic compounds (VOC) per the requirements set forth by the Green Seal Standards GS-11 and GC-03 for paint
- Architect: ARCHITECTS Hanna Gabriel Wells
- Construction Manager: Rebecca Myers, URS Corp.
- General Contractor: HAR Construction
- Structural Engineer: Arcon Engineers
- Electrical Engineer: ILA Zammit Engineering
- Mechanical Engineer: Walsh Engineers
- Propositions S and N Program Manager: Gafcon, Inc.
- Campus Project Manager: Thomas J. Fine
- Assistant Campus Project Manager: Rachel Fornaca
|