1141 - "L" Building Renovation

Project Delivery Method                Design-bid-build

Project Budget                             $10.3 million

Construction Duration                   2008 - 2009

 

Scope/Summary

 

The Academic Success Center (L Building) renovation consists of the interior demolition of an existing two-story concrete building with complete structural upgrades, and interior renovation totaling approximately 28,700 sf. The renovation will include new space for Tutoring; the Math and English Centers; Trio Aspire; New Horizons; Umoja; Math, English & Science Achievement (MESA); Extended Opportunity Programs & Services (EOPS); Puente; Assessment and Advising, along with general classroom space.

 

The project involves replacement of all exterior windows and doors; replacement of elevator and interior stair; new interior non-load bearing partitions; modifications to structural concrete, new ceilings; new mechanical and electrical systems, distribution and fixtures; and all new architectural finishes.  Nearly 5,000 sq. ft. of the existing concrete structure was preserved and sandblasted.  Exterior work includes a new entry canopy structure, lighting and signage.  All existing landscaping was preserved.

 

The project includes a number of special features:

·          All exterior aluminum windows have thermal-setting powder coat finish applied to optimize temperature control efficiency

·          Waterless urinals and electric hand-dryers were installed in restrooms to cut down on the waste of resources

·          Enviro SLAB terrazzo was used for all countertops and backsplashes - this terrazzo is made from 100% post consumer/post industrial recycled glass and is designed to be cleaned with non-corrosive and biodegradable cleaners

·          All paint used is low-fume and complies with VOC limits for volatile organic compounds (VOC) per the requirements set forth by the Green Seal Standards GS-11 and GC-03 for paint

  • Architect: ARCHITECTS Hanna Gabriel Wells
  • Construction Manager: Rebecca Myers, URS Corp.
  • General Contractor: HAR Construction
  • Structural Engineer: Arcon Engineers
  • Electrical Engineer: ILA Zammit Engineering
  • Mechanical Engineer: Walsh Engineers
  • Propositions S and N Program Manager: Gafcon, Inc.
  • Campus Project Manager: Thomas J. Fine
  • Assistant Campus Project Manager: Rachel Fornaca

 Related Sources

  City College Precise Plan
  SDCCT Design Philosophy
  San Diego City College
  Career Tech Center: Carrier Johnson Presentation Boards
  2009.12: 'District Wide - Hand Dryers Vs. Paper Towels' Fact Sheet:
  Fact Sheet: City College Academic Success Center - "L" Building Renovation (2010.03)

 Gallery

  2009.06.17: L Building Exterior

 News & Events

  2010.04.05: 'College Construction Boom San Diego Community College District’s $1.6 billion construction bonds program is creating jobs and transforming the campuses' San Diego Metropolitan
  2009.12.07: 'Propositions S and N Facilities and Master Plan Update' Presented by Dave Umstot
  2009.06.29: 'Academic Success Center at San Diego City College' San Diego Business Journal
  2009.04.06: 'San Diego City College transforms' SDDT.com Media
  2009.04.05: 'S.D. City College growth continues' - The Daily Transcript
Copyright © 2007 SDCCD. All Rights Reserved.