1132 - "D" Building Roof
Project Delivery Method Design-Bid-Build
Project Budget $4.6 million
Construction Duration 2010 - 2011
Scope/Summary
The D Building Roof Replacement project will consist of the removal and replacement of approximately 24,000 sf of roofing and concrete surface decking at the upper student pavilion adjacent to the A building.
Current Issues
This project is in the planning phase and has not yet been assigned for design. It is anticipated to begin Design in late 2008 to early 2009 with a construction start date estimated around April of 2010.
- Architect: T.B.D.
- Construction Manager: T.B.D.
- General Contractor: T.B.D.
|
|
|
|
|
|
|
|
|
|
 |
 |